![]() |
Show 20 posts from this thread on one page |
VisorCentral.com (http://discussion.visorcentral.com/vcforum/index.php)
- How To / Troubleshooting (http://discussion.visorcentral.com/vcforum/forumdisplay.php?forumid=2)
-- Hotsync Manager - Conduit Ordering (http://discussion.visorcentral.com/vcforum/showthread.php?threadid=3090)
Is it possible to change the order of the conduits listed in the hotsync manager?
quote:
Originally posted by nurcombe:
Is it possible to change the order of the conduits listed in the hotsync manager?
Occasionaly PhlegmHack causes a conflict with AvantGo when synching, requiring my VDx be reset.
I would like to move MobiLink to be the last job done.
If you go into the developers' section of palmos.com, you should be able to download the conduit development kit. Inside it, there is a tool that one can use to set various settings for the installed conduits. In general, do not change anything you do not know about. However, one of the settings for the conduits is priority. By changing the priority you can change the order in which they are run.
Please note: I have not actually done this. I have just run the tool a few times, and skimmed the documentation.
| All times are GMT. The time now is 07:44 AM. | Show 20 posts from this thread on one page |
Powered by: vBulletin Version 2.3.4
Copyright © Jelsoft Enterprises Limited 2000 - 2016.