news | articles | reviews | software | modules | accessories | discussion | faq | mobile | store
VisorCentral.com >> Discussion >> Visor Related >> How To / Troubleshooting
List View with To Do items?

Post a New Thread | Post A Reply

  Last Thread   Next Thread
Author
Topic: List View with To Do items?    
mpschein
Member

Registered: Dec 1999
Location:
Posts: 2

Question

One of the features I was looking forward to using in the Date Book + is the List View (6th icon out of the 6) which according to the advertisements as well as the manual (page 95 at the top):
"The List View is a text-oriented view that is integrated with To Do List. It displays a list of events and To Do items for the selected week(s)."

I cannot get a To Do item to appear in the list, and I have tried the various Preferences; certainly All should include the applicable To Do item. I am sure the date is correct because I added a test To Do item with tomorrow's date. Anybody else have this problem or the solution?

BTW: I ordered an Ice and Green simultaneously on Nov 14th. The Ice arrived Dec 16th via FedEx; the Green = ??? on backorder.

[Originally posted in the OS Software section]

mpschein is offline Old Post 12-20-1999 02:15 PM
Click Here to See the Profile for mpschein Edit/Delete Message Reply w/Quote
LarryD
Member

Registered: Oct 1999
Location: Columbia, MO, USA
Posts: 68

Post

Go to the Week view (3rd icon from left), drop down the menu, and select To Do Preferences.

You'll need to select which categories you wish to have displayed as well as set some other options to your preferences.

LarryD

LarryD is offline Old Post 12-20-1999 08:02 PM
Click Here to See the Profile for LarryD Edit/Delete Message Reply w/Quote
mpschein
Member

Registered: Dec 1999
Location:
Posts: 2

Post

Thanks Larry -- I never would have guessed it was in only that View. I wonder how difficult it would be for them to modify the program to show it in the List view as well.

mpschein is offline Old Post 12-20-1999 08:07 PM
Click Here to See the Profile for mpschein Edit/Delete Message Reply w/Quote
LarryD
Member

Registered: Oct 1999
Location: Columbia, MO, USA
Posts: 68

Post

I can't think it would be very hard... I was surprised to find it worked that way. Your question caught my interest, because I knew that I had seen my tasks in that view previously, but only one old task was showing when I went to research the issue.

Turns out that I just recently started categorizing my tasks, so only the one old one that I missed categorizing was showing up. I needed an answer to your question and didn't even know it yet.

LarryD

LarryD is offline Old Post 12-21-1999 07:15 AM
Click Here to See the Profile for LarryD Edit/Delete Message Reply w/Quote
All times are GMT. The time now is 03:03 AM. Post New Thread    Post A Reply
  Last Thread   Next Thread
[ Show a Printable Version | Email This Page to Someone! | Receive updates to this thread ]

Forum Jump:

Powered by: vBulletin Version 2.3.4
Copyright ©2000, 2001, Jelsoft Enterprises Limited.